Ongoing Projects

S.noProject NameProject Cost (In Cr.)
1Construction of Two lane with Paved Shoulder for Fatehpur Bypass (Design Km. 0.000 to Km. 7.400), Mandawa Bypass (Design Km. 20.925 to Km. 27.300) & Jhunjhunu Bypass (Design Km. 41.625 to Km. 54.689) of NH-11 on EPC Mode in the state of Rajasthan – Earthwork cutting, loading, transportation, unloading & spreading of earth of subgrade of roadway and embankment at Jhunjhunu Bypass3.50
2Design and Construction of Vehicular Underpass with approaches at Khodad Junction (Km.78.600) and Ambikhalsa Junction (Km.113.150) on Khed Sinnar section of NH-60 (Old NH-50) in the State of Maharashtra as Standalone project on EPC Mode29.30