Ongoing Projects
S.no | Project Name | Project Cost (In Cr.) |
---|---|---|
1 | Construction of Two lane with Paved Shoulder for Fatehpur Bypass (Design Km. 0.000 to Km. 7.400), Mandawa Bypass (Design Km. 20.925 to Km. 27.300) & Jhunjhunu Bypass (Design Km. 41.625 to Km. 54.689) of NH-11 on EPC Mode in the state of Rajasthan – Earthwork cutting, loading, transportation, unloading & spreading of earth of subgrade of roadway and embankment at Jhunjhunu Bypass | 3.50 |
2 | Design and Construction of Vehicular Underpass with approaches at Khodad Junction (Km.78.600) and Ambikhalsa Junction (Km.113.150) on Khed Sinnar section of NH-60 (Old NH-50) in the State of Maharashtra as Standalone project on EPC Mode | 29.30 |