On-going Projects
| S.no | Project Name | Client | Amount(In Lakh) |
|---|---|---|---|
| 1 | Balance works of Four Laning of Sinnar to Shirdhi Section of NH-160 from design Ch. 0.000 to Km. 50.943 in the State of Maharashtra on EPC Mode | M/s New India Structures Pvt. Ltd. | 5813.00 ---------- 701.00 CoS |
| 2 | Design & Construction of Animal Overpass Crossing Structure at Km. 113+300 (Khandarmalwadi) & 157+150 (Khrhe Ghat) in Khed Sinnar NH-60 Section from Km. 42.000 to Km. 179.946 (Total Length 137.946 Km) in the State of Maharashtra as Standalone project. | M/s New India Structures Pvt. Ltd. | 665.00 |