Completed Projects
| S.no | Project Name | Client | Amount(In Lakh) |
|---|---|---|---|
| 1 | Construction of two lane with paved shoulder for Fatehpur bypass (design km. 0+000 to 7+400), Mandawa Bypass (Km. 20+925 to 27+300) and Jhunjhunu Bypass (design Ch. 41+625 to 54+689) of NH-11 in the state of Rajasthan on EPC Mode | M/s NGC-TCC JV | 500.00 |
| 2 | Construction of Vehicular Underpass with approaches at Khodad Junction (Km.78.600) and Ambikhalsa Junction (Km.113.150) on Khed Sinnar section of NH-60 in the State of Maharashtra on EPC Mode | M/s New India Structures Pvt. Ltd. | 2904.00 ----------- 570.00 CoS |